The Northbrook Report is maintaining a page dedicated to unbiased reporting about the Meadow Plaza Development. Last updated November 23, 2026.Visit the page →
Plan Commission · October 6, 2026

Plan Commission, 06 Oct 2026: Pulte's 150-Condo Meadow Plaza Redevelopment

The Northbrook Plan Commission will hold a special meeting to consider a major mixed-use redevelopment of the former Meadow Plaza shopping center, along with a minor residential lot-line adjustment.

Key items

  • Meadow Plaza Mixed-Use Redevelopment — A 150-unit, six-story condo and retail development would replace the existing Meadow Plaza shopping center, reshaping a prominent commercial site and requiring multiple zoning and Comprehensive Plan changes.
  • Park Dedication Waiver Request — Pulte is asking to dedicate less than the code-required 87,120 square feet of park and recreational land, which could affect open space available to future residents and the surrounding neighborhood.
  • Right-of-Way Reductions for New Streets — Proposed public streets Riverview Drive and a Keystone Avenue extension would be narrower than village standards, potentially affecting traffic flow and pedestrian infrastructure near the development.
  • Comprehensive Plan Amendment and Rezoning — A small Shermer Road parcel would shift from an Institutional designation to Village Center Mixed Use, signaling a broader change in the village's long-range land-use vision for that corridor.
  • Lot-Line Adjustment at 1370–1380 Rosemary Lane — Two adjacent single-family lots under common ownership would have their shared boundary relocated, a routine but legally significant change to residential property records.

Full agenda — click any item to expand

Minor Subdivision: 1370–1380 Rosemary Lane

Applicant Syeda Batool Abbas is seeking approval of a lot-line adjustment between two single-family residential parcels she owns under common ownership in the R-2 Single-Family Residential District. The adjustment would shift the interior lot line between the two adjacent properties. This is a public meeting, not a public hearing.

Public Hearing: Meadow Plaza Redevelopment, 1901–1975 Cherry Lane & 1807 Shermer Road

Pulte Home Company LLC, as contract purchaser of the Meadow Plaza site, is seeking a broad package of approvals to redevelop the property into a mixed-use Planned Unit Development with 150 for-sale condominium units in buildings up to 68 feet and six stories tall, plus two single-story commercial/retail buildings of approximately 5,500 square feet each. The proposal also includes a Tentative Plat of Subdivision and requests waivers to reduce the required park-dedication land below 87,120 square feet, narrow two proposed public rights-of-way (Riverview Drive from 60 to 44 feet, and a Keystone Avenue extension from 60 to 59 feet), and several zoning variations including reduced rear-yard and landscape setbacks. Additionally, a small parcel fronting Shermer Road near the river would be re-designated in the Comprehensive Plan from Institutional Facility to Village Center Mixed Use and rezoned from IB Institutional Building District to C-2 Neighborhood Commercial District to bring it under consistent zoning with the rest of the site.

What actually happened

Plan Commission, 06 Oct 2026: Pulte Proposes 150 Condos at Meadow Plaza

The Northbrook Plan Commission held a special meeting October 6, 2026, centered on a major redevelopment proposal for the Meadow Plaza shopping center at Cherry Lane and Shermer Road, drawing extensive public opposition before the hearing was continued to October 20.

1370-1380 Rosemary Lane: Minor Lot Line Adjustment Approved

Syeda Batool Abbas applied for a minor subdivision to adjust the lot line between two single-family residential properties on Rosemary Lane. The Commission waived staff presentation and voted unanimously (7-0) to approve the resolution as prepared by staff.

Meadow Plaza Redevelopment: 150 Condos and Retail Proposed for Cherry Lane Site

Pulte Home Company LLC, as contract purchaser, presented plans to redevelop the Meadow Plaza shopping center at 1901–1975 Cherry Lane and 1807 Shermer Road into a mixed-use development featuring 150 for-sale condominium units across three six-story buildings and two approximately 5,500-square-foot commercial/retail structures. The application also requests a Planned Unit Development, a tentative plat of subdivision, several zoning variations (including reduced rear yard setback, reduced parking lot landscape setback, and reduced right-of-way widths), a Comprehensive Plan amendment, and a rezoning of a small Shermer Road parcel from Institutional Building to C-2 Neighborhood Commercial. The development team presented analysis projecting the project would generate roughly $629,400 in annual Village revenue at full build-out, reduce peak-hour traffic compared to the existing shopping center, and add an estimated $6 million in annual retail spending potential from future residents. Numerous residents spoke in opposition, raising concerns about parking loss for the adjacent Village Church, traffic impacts, building height and density, tree removal, environmental effects, and changes to the character of downtown Northbrook; one current Meadow Plaza business tenant also spoke. Commissioner Melnick questioned the retail analyst's calculations and suggested adding more commercial space; Commissioner Braiman expressed serious concerns about residential density, building height, and design. The Commission voted unanimously (7-0) to continue the public hearing to October 20, 2026, with no decision reached.

Sources: https://northbrook-il.granicus.com/MinutesViewer.php?view_id=2&clip_id=1277&doc_id=a6606c3b-e428-11f1-9c50-005056a84798

Read the official documents

{
  "card_hook": "Pulte Home Company seeks Plan Commission approval for 150 condos and retail on the Meadow Plaza site at Cherry Lane and Shermer Road in Northbrook.",
  "key_items": [
    {
      "title": "Meadow Plaza Redevelopment (1901–1975 Cherry Lane)",
      "why_matters": "A proposal to replace the existing Meadow Plaza shopping center with three six-story condo buildings and new retail drew heavy resident opposition over parking, traffic, building height, and neighborhood character — with the hearing continuing October 20."
    },
    {
      "title": "Church Parking Elimination Concerns",
      "why_matters": "Multiple residents and community organizations testified that the redevelopment would end informal parking arrangements at Meadow Plaza used by the adjacent Village Church, threatening operations of a nursery school, music festival, and several civic groups."
    },
    {
      "title": "Traffic Study Disputed by Residents",
      "why_matters": "Several residents challenged the applicant's traffic impact study, requesting a weekend count and post-construction traffic modifications if negative impacts materialize."
    },
    {
      "title": "Fiscal and Retail Impact Analysis",
      "why_matters": "The applicant projects $629,400 in annual Village revenue and $6 million in new downtown retail spending if 150 condos are occupied, while a retail analyst argued the existing Meadow Plaza is heavily underperforming and that reducing retail supply will strengthen the remaining downtown market."
    },
    {
      "title": "1370–1380 Rosemary Lane Lot Line Adjustment",
      "why_matters": "A minor subdivision adjusting the boundary between two residential lots on Rosemary Lane was approved unanimously, affecting the two properties directly involved."
    }
  ]
}

Read the official documents