Plan Commission, 20 Oct 2026: Pulte's 150-Condo Meadow Plaza Redevelopment
The Northbrook Plan Commission will hold a continued public hearing on a major mixed-use redevelopment proposed by Pulte Home Company LLC at the site of Meadow Plaza, a shopping center at 1901–1975 Cherry Lane and 1807 Shermer Road.
Key items
- Meadow Plaza redevelopment — 150 condos and retail — Pulte's plan would replace an existing commercial center with six-story residential buildings and two retail structures, reshaping a prominent Northbrook intersection.
- Zoning variations and setback reductions — The project requires multiple variances, including reduced rear yard setbacks and narrower road rights-of-way, which could affect neighboring properties and traffic flow.
- Park land dedication waiver — The applicant is requesting permission to dedicate less than the code-required 87,120 square feet of park and recreational land, potentially reducing open space tied to the development.
- Comprehensive Plan Amendment and rezoning — A small parcel along Shermer Road would be reclassified from Institutional to Village Center Mixed Use and rezoned to commercial, changing its long-term land-use designation.
Full agenda — click any item to expand
Pulte Mixed-Use Redevelopment at Meadow Plaza (PCD-26-05)
Pulte Home Company LLC, as contract purchaser, is seeking approval to redevelop the Meadow Plaza site into a mixed-use development with 150 for-sale condominium units and two commercial/retail buildings of approximately 5,500 square feet each. The residential buildings would reach 68 feet and six stories in height, with indoor first-floor parking beneath the residential units. The commission will consider a Planned Unit Development, a Tentative Plat of Subdivision, and several zoning variations including reduced rear yard setbacks, reduced parking lot landscape setbacks, and narrowed public rights-of-way for two proposed roads — Riverview Drive (from 60 feet to 44 feet) and a Keystone Avenue extension (from 60 feet to 59 feet). The applicant is also requesting a waiver to allow a park and recreational land dedication smaller than the required 87,120 square feet, a Comprehensive Plan Amendment for a small parcel fronting Shermer Road from Institutional Facility to Village Center Mixed Use, and a rezoning of that parcel from IB Institutional Building District to C-2 Neighborhood Commercial District.
What actually happened
Plan Commission, 20 Oct 2026: Meadow Plaza Redevelopment Draws Fierce Opposition
Dozens of residents, business owners, and expert witnesses spoke against Pulte Home Company's proposed six-story mixed-use redevelopment of Meadow Plaza during a lengthy special meeting that ended with the public hearing continued to October 21, 2026.
Pulte Home Company Proposal for 1901–1975 Cherry Lane & 1807 Shermer Road (Docket PCD-26-05)
Pulte Home Company LLC is seeking approval to redevelop the Meadow Plaza shopping center and an adjacent Shermer Road parcel into a mixed-use planned unit development featuring three six-story residential buildings (68 feet tall, 150 condominiums total), single-story commercial structures totaling approximately 11,000 square feet, and a constructed wetland/stormwater basin. The application also requests a comprehensive plan amendment, a rezoning of a small sliver of the Shermer Road parcel, a tentative plat of subdivision, and numerous zoning variations including reductions in rear yard setbacks, right-of-way widths, landscaping setbacks, and park dedication area. The site currently operates as an approximately 90,000-square-foot neighborhood shopping center.
More than two dozen residents and several retained experts spoke in opposition during the public comment period. Objections centered on the proposed buildings' height and density exceeding underlying zoning limits (the Village Green Overlay District allows four stories by right and five with a special permit), the reduction of commercial space from roughly 90,000 to 11,000 square feet, uncertainty about whether and when the commercial component would be built, potential traffic and school-enrollment impacts, effects on the adjacent Village Church of Northbrook (including parking access and tree removal along its memorial garden), the architectural character of the proposed buildings, and concerns about exterior materials including fiber cement siding. Attorney Sanford Stein, retained by Save Downtown Northbrook NFP, argued that the applicant had not satisfied all seven required planned unit development standards under the zoning ordinance, including plan alignment, placemaking, integrated design, compatibility, natural features, gathering space, and protection of historical/cultural resources. He also contended that Meadow Plaza may be eligible for the National Register of Historic Places as an example of post-World War II suburban commercial architecture, and that the Village Church of Northbrook—founded in 1892—is an off-site cultural resource the applicant had not adequately addressed. Architectural historian Susan Benjamin testified that she had not been given access to original drawings or permits needed to complete an eligibility analysis. Land planner Steve Lenet testified that the application lacked specificity required of a planned unit development as a form of contract zoning.
During cross-examination of petitioner witnesses, Pulte's traffic consultant Hany Aboona confirmed that traffic counts were taken on August 20 when two private schools were not yet in session, and that freight train crossings were accounted for only during peak hours. Civil engineer Todd Shaffer confirmed that no stormwater detention currently exists on site, that the three proposed underground vaults require excavating through an engineered barrier mandated by an existing Illinois EPA No Further Remediation (NFR) letter, and that he did not test stormwater runoff for contamination. Landscape architect Geoff Roehll confirmed that the constructed wetland's mechanical circulation system has a 10–15 year life cycle and that he did not know who would pay for its maintenance. Fiscal analyst David Gruen confirmed that the project's estimated $629,362 in annual Village revenue is based on full build-out of uncertain timing, and that the proposed commercial space would generate approximately $30,000 less in direct sales tax than the site currently produces.
One resident, David Hochberg, spoke in support, citing the project's approximately $60 million investment and the Village's roughly $230 million in combined pension obligations and needed facilities. Attorney McGuire, representing Pulte, noted that lead witness Matt Getz was unavailable and requested that cross-examination of Getz and petitioner responses to outstanding questions be consolidated at the continued session.
Chairman Elisco ruled during cross-examination that parking sufficiency is outside the Commission's jurisdiction because Illinois's People Over Parking Act preempts the Village's minimum parking requirements for sites within a half mile of a transit station, and that stormwater engineering conditions are addressed at the building permit stage rather than by the Plan Commission. Village Attorney Culbertson confirmed the parking preemption.
Commissioner Walden moved, seconded by Commissioner Morgen, to continue the public hearing to October 21, 2026. The motion passed 8–0. Village Attorney Culbertson clarified that public testimony was closed and the continuation was for limited purposes only.
Read the official documents
{
"card_hook": "Plan Commission hears two hours of opposition to Pulte's 150-unit, six-story Meadow Plaza redevelopment at Cherry Lane and Shermer Road.",
"key_items": [
{
"title": "Pulte Meadow Plaza redevelopment (PCD-26-05)",
"why_matters": "The proposal would replace roughly 90,000 sq ft of neighborhood retail with three 68-foot residential buildings and only 11,000 sq ft of commercial space, potentially displacing existing businesses and changing the character of downtown Northbrook."
},
{
"title": "Six-story height and zoning variations",
"why_matters": "The Village Green Overlay District allows four stories by right and five with a special permit; Pulte is requesting six stories, setting a precedent that experts warned could define downtown development for generations."
},
{
"title": "Commercial space and phasing uncertainty",
"why_matters": "The petitioner's own fiscal analyst confirmed that the timing of the commercial component is unknown and that the proposed retail would generate about $30,000 less in annual sales tax than the site currently produces."
},
{
"title": "Village Church parking and Riverwalk easement",
"why_matters": "Opponents testified that the proposed Riverwalk requires an easement the church has indicated it will not grant, and that the project would eliminate shared parking used by older congregants and disability-services program participants."
},
{
"title": "Illinois EPA No Further Remediation letter and stormwater",
"why_matters": "The engineer confirmed that underground stormwater vaults require excavating through an environmental barrier mandated by an existing NFR letter, raising questions about construction sequencing and contamination that remain unresolved before the Commission."
}
]
}