The Northbrook Report is maintaining a page dedicated to unbiased reporting about the Meadow Plaza Development. Last updated November 23, 2026.Visit the page →
Weekly Manager's Report · November 20, 2026

Manager's Report — 20 Nov 2026: Sales Tax Revenue Up 5.3% Year-to-Date

Northbrook's November manager's report covers canceled Thanksgiving-week board meetings, a 5.3% year-to-date sales tax gain, and a range of active construction and infrastructure projects heading into winter.

Full agenda — click any item to expand

Upcoming Meetings

Both scheduled meetings for Tuesday, November 24 have been canceled. The Committee of the Whole (6 p.m.) and the Village Board of Trustees (7:30 p.m.) will not be held in observance of the Thanksgiving holiday.

Activity Reports

The Police Department held a second informal public presentation on Wednesday, November 18, covering the department's License Plate Reader (LPR) camera program. Representatives shared the department's experience with the technology, described its effectiveness in supporting law enforcement, and took questions from residents. More information is available on the Village's LPR FAQ webpage.

The Village welcomed Nicko Branscum as the new Community Service Officer in the Northbrook Police Department.

A weekly Police Bulletin for the week ending November 20, 2026 is also available.

Save the Date

Winter Composting Collection: LRS, the Village's refuse hauler, will shift to every-other-week compost pickup from December through March. The last weekly collection is November 25; there will be no collection on December 2. Weekly service resumes April 7, 2027.

Holiday Office Closures: All non-emergency Village offices will be closed Thursday, November 26, and Friday, November 27, for Thanksgiving. LRS refuse collection for Thursday and Friday routes will be delayed by one day; Monday through Wednesday routes remain on schedule.

National Community Survey: All Northbrook residents are invited to complete the National Community Survey by December 4. Households that received a postcard may respond by mail or via the link on the card; an open survey is also available to all residents online. The survey covers quality of life and Village services and is offered in English, Spanish, and Korean.

Project Updates

Sales Tax: Monthly sales tax collections through August 2026 (distributed to the Village in November 2026) totaled $1,958,970, up 5.5% compared to the same month in 2025. On a year-to-date basis, collections are $401,063, or 5.3%, ahead of the prior year. The figure includes the 1% municipal, 1% home rule, and 3% local cannabis taxes.

125th Anniversary Recap: The Village's 125th Anniversary Open House was held Sunday, November 15. The event featured birthday cake, historical displays, and local artwork. Photos from the event's photo booth are available on the Northbrook 125th Anniversary website.

Electric Vehicle Charging Station: The Village's contractor completed installation of signage and commissioned a new EV charging station at the Public Works Center this week; it is now open for public use. The project is part of the Village's Climate Action Plan.

Winter Preparedness / Right-of-Way Reminder: The Village reminded property owners to remove temporary structures — such as portable basketball hoops, Little Free Libraries, and boulders — from the public right-of-way (PROW) before snow season. Items left in the PROW can obstruct snow removal operations, and the Village will not be responsible for damage to improperly placed items. Questions may be directed to Public Works at (847) 272-4711.

Fall Tree Planting Program: The Village's fall parkway tree planting program began this week, with 245 trees scheduled to be planted — 190 replacements (including Emerald Ash Borer and warranty replacements), 15 for developer obligations, and 40 through the cost-sharing program (55 net new trees). Planting is expected to be completed the week of November 30.

Parkway Stump Removal: The Village's contractor continued grinding stumps from 107 parkway trees removed in October. Grinding is expected to finish the week of November 30, after which Public Works will restore affected areas with topsoil and grass seed. Residents near those areas are encouraged to water newly seeded spots regularly.

Koepke Road Storm Sewer and Roadway Improvements: A public open house held November 11 at Village Hall drew more than 30 residents. Village staff and engineering consultants fielded questions and gathered feedback on the proposed storm sewer and roadway improvements.

FY 2026–2027 Concrete Street Patching — Charlemagne Subdivision: This week the contractor prepared joints of newly replaced concrete pavement and applied rubber joint sealant. The week of November 23, weather permitting, the contractor plans to complete landscape restoration including sod placement and street sweeping.

Kingston Drive / Pfingsten Road Intersection & Techny Road Sidewalk: Crews poured concrete for a new pedestrian crossing island at Kingston Drive and Pfingsten Road and began asphalt patching. At Techny Road and Greenview Road, crews completed concrete for new sidewalks, curbs, and gutters. Asphalt patching and restoration work at both locations is planned for the week of November 23. Questions may be directed to Project Manager Michael Weller at (847) 272-4711 or Michael.Weller@northbrook.il.us.

Fleet Maintenance Garage Construction: The contractor completed spray foam insulation and installed vapor barriers around office-area windows. Next week crews will continue concrete masonry and structural steel support in the garage area, along with office window installation, site paving, and mechanical and plumbing rough-in work.

Fire Station 11 Construction: The contractor completed structural steel installation for the main building structure, continued metal decking detail work, began framing roof parapets, and continued geothermal drilling on the north side of the site.